Industrial Corridor Community Organization

Keeping the community involved

Skip to content
  • Scope of Work: ICCO Planning Initiative
  • ICCO Planning Documents
  • Consultants

Links

Resources

ICCO_Proposal_10-28-11

Eugene Zoning Code Chapter 9

Metro Plan

Draft ICCO Planning Documents

 

Existing Conditions

0 – ICCO Neighborhood (4-27-12)

1B1 -2009 Aerial (4-30-12)

1B2 -2000 Aerial (4-30-12)

1B3-1995 Aerial (4-30-12)

1B4 -1979 Aerial (4-30-12)

3A – MetroPlan Diagram (4-27-12)

3B1 – TransPlan Federal Roadway Class (4-27-12)

3B2 – TransPlan Financially Constrained Roadways (4-27-12)

3B4 – TransPlan Potential Nodal Areas (4-26-12)

4A -Lane County Plan Map (4-26-12)

4B -Lane County Zone Map (4-27-12)

5B RefinementPlans 11X17

5C_Neighborhood Associations_11X17

5D_COE_ZONING_11X17

5D2_COE_ZONING_Overlay_11X17

5E1_Roadway_Jurisdiction_11X17

5E2_Roadway_CLASS_11X17

5E3_Roadway_11X17

5E6 -LTD Routes and Proposed TransPlan Rapid Transit Routes (4-26-12)

6A – Goal 5 Sites (4-27-2012)

6B – Water Quality Waterways (4-27-12)

6C – Wetland Inventory (4-27-12)

6D – NRCS Soils Map (4-27-12)

6E – Rare Species Preliminary Screening (4-27-12)

8A2A_STORMWATER_drainage_basins_11X17

8A2B_STORMWATER_facilities_11X17

8A4A_STORMWATER_CIP_11X17

8B2A_SanitaryBasins_11X17

8B2B_Sanitary_Facilities_11X17

8B3_WastewaterSystemPlan_11X17

Leave a Reply Cancel reply

You must be logged in to post a comment.

July 2026
M T W T F S S
« Mar    
 12345
6789101112
13141516171819
20212223242526
2728293031  
Proudly powered by WordPress